Quarterly Impact Report | Q4 2026

What the buildout draws from the grid and the watershed.

The free tracker follows every Denver metro data center, and the monthly editions report the news. This quarterly report is the synthesis: the full inventory, the aggregate power picture, a project by project audit of what is and is not disclosed about water, and the quarter's regulatory changes, in one sourced PDF.

Built for utility and water planners, site selectors, journalists, community groups, and anyone testifying, writing, or deciding about this buildout. Every figure comes from a public disclosure, a permit, or a proceeding. Gaps are labeled not disclosed, never estimated.

What the Q4 2026 edition covers

  • The full inventory. All 29 tracked facilities: 24 operating, 3 under construction, 2 announced and unverified, with operator, city, size, and disclosed power for each, plus breakdowns by city and operator.
  • Power capacity and grid impact. 107.65 MW of disclosed operating capacity across the 13 facilities that publish a figure, against a disclosed pipeline of 734.5 to 751.5 MW. The Xcel Energy large load tariff proceeding, diesel backup fleets, and the public incentive figures behind the largest projects.
  • The water and cooling disclosure audit. Project by project: Vantage Trident's closed loop figures, stated to reporters under council pressure in October; Flexential Parker's waterless design; and the QTS Aurora campus, the metro's largest construction project, which discloses no cooling type and no water figures at all. Aurora's tiered water framework and cooling rules included.
  • The quarter's changes. The Brighton and Arvada moratoria, Aurora's failed moratorium reconsideration, Denver's Data Center Working Group, and the project milestones that mattered, dated and sourced.
  • Methodology and sources. Aggregation rules, definitions, limitations, and the full source list, so every number in the report can be checked.

The headline finding

Of 29 tracked facilities, one has published project specific water figures, one states a waterless design without figures, and 27 publish nothing. Until a disclosure rule exists, water accounting for this buildout depends on politics, project by project. The report documents that gap in full, and republishes the count every quarter.

Honest scope

This is the inaugural edition, compiled November 6, 2026, covering the fourth quarter to date from tracker data current through the November 2026 monthly edition. December developments belong to the next edition. Announced capacity figures are developer statements and are labeled unverified throughout. This purchase is this edition only; future quarterly editions are sold separately.